busevi.rs

Belgrade public transport

All changes
RoadworksActive

Public Transport Route Detour for Line 76 Due to Works in Autoput za Zagreb Street (Phases 3 & 4)

Change details

During the construction of the sewage and stormwater drainage network in Autoput za Zagreb Street in New Belgrade – Phases 3 & 4, from August 25 to September 30, 2026, temporary route changes will be in effect for bus line 76.

The works include trench excavation along the roadway of Autoput za Zagreb Street, on the section from the "NIS Petrol" gas station to the intersection with Smolućska Street (left side heading towards Smolućska Street).

Route Detour for Line 76

  • 🚌 Line 76 (both directions): Buses will operate in both directions via Dr Žorža Matea Street directly to the "Bežanijska kosa" terminus, without stopping by PUC "Zelenilo – Beograd".

Duration
25.08.2026. – 30.09.2026.

Published: 21 August 2026 at 18:56

Affected lines