Milana Rakića: lines 62 and 64 change route until 20.10.
Road works in "Milana Rakića" street from 07 to 20.10.2026 close one section. Lines 62 and 64 operate on altered routes; new stops "Deskaševa 1" are located in "Milana Rakića" street near the intersection with "Jovane Đaje".
- Duration07.10.2026. – 20.10.2026.
- LocationMilana Rakića
- ContractorBeogradski vodovod i kanalizacija
- Lines affected2
Published 6 October 2026 at 11:01 · Updated 14 October 2026 at 23:30
What changes
Altered routes
Lines 62 and 64 bypass the closed section of "Milana Rakića" street between "Batutova" and "Učitelja Miloša Jankovića".
Towards Mirijevo and Šumice: vehicles travel via "Batutova", "Bulevar kralja Aleksandra", "Vjekoslava Kovača", "Deskaševa", "Milana Rakića".
Towards Zvezdara: vehicles travel via "Milana Rakića", "Deskaševa", "Bulevar kralja Aleksandra", "Batutova".
Line 64 in both directions also adjusts for works in "Mlavska" street.
Temporary stops
- "Deskaševa 1" (towards Zvezdara): "Milana Rakića" street, opposite building no. 93, about 5 meters from the intersection with "Jovane Đaje"
- "Deskaševa 1" (towards Šumice): "Milana Rakića" street, opposite building no. 95, about 40 meters from the intersection with "Jovane Đaje"
Vehicles also use other existing stops on the new routes.
Show the operator’s original text
Other changes
All changes- RoadworksMlavska Street: line 64 changes route until 14.10.Active 22.09.2026. – 16.10.2026.Same lines64
- RoadworksGeteova Street: lines 15, 78 and 15N change routeActive 14.10.2026. – 03.11.2026.
- RoadworksKneza Višeslava: 8 lines without "Vojni medicinski centar" stopActive 14.10.2026. – 07.11.2026.
- RoadworksSurčinska – Deonica 4: lines 71 and 603 change route until 25.10.Active 12.10.2026. – 25.10.2026.
- Stop changeSurčinska Street: 9 bus lines with service changes until October 15Active 10.10.2026. – 15.10.2026.
- RoadworksDunavska: Lines 26, 26N and 401N change route until October 21Active 03.10.2026. – 21.10.2026.