Roadworks on Dobrovoljačka Street
Change details
During the first phase of works on the reconstruction of Dobrovoljačka Street in Zemun (on the section from Cara Dušana Street to Ugrinovačka), traffic on this street will be completely suspended.
The works will be carried out from 23 September 2025 to 15 September 2026, and during this period public transport vehicles will operate as follows:
Public transport service changes
Line 45:
Towards the „Zemun (Novi grad)“ terminus: Cara Dušana – Filipa Višnjića – Rada Končara and then along the regular route.
Towards Blok 44: Vehicles operate along the regular route.
Line 83:
Towards the „Zemun (Bačka)“ terminus: Cara Dušana – Filipa Višnjića – Ugrinovačka and then along the regular route.
Towards Crveni krst: Vehicles operate along the regular route (and in line with the current changes due to the removal of the Old Sava Bridge).
Temporary stop
For line 45, the temporary stop „Filipa Višnjića 2“ (stop code: #3573) is being introduced. The stop is located on Filipa Višnjića Street, at house number 30 (in the direction of Ugrinovačka Street), just before the intersection with Rada Končara and Ugrinovačka streets.
ℹ️ Note: On the diverted section of the route, vehicles will use all existing public transport stops.
- Location
- Zemun
- Duration
- 23.09.2025. – 15.09.2026.
Published: 27 June 2026 at 13:29 · Updated: 9 July 2026 at 00:47








