Zemunski put: Lines 9A and 60 change routes until September 2027
Due to works on the Old Sava Bridge, line 9A operates on a different route from June 9, 2026 to September 2, 2027. Line 60 runs normally but with solo vehicles instead of minibuses. Two new temporary stops replace previous ones at Sajmište.
- Duration09.06.2026. – 02.09.2027.
- LocationZemunski put
- ContractorDirekcija za građevinsko zemljište i izgradnju Beograda
- Lines affected2
Published 8 September 2026 at 11:49 · Updated 16 November 2026 at 03:30
What changes
New route for line 9A
Line 9A bypasses the closed section of ulica Zemunski put from Vladimira Popovića to Zarije Vujuoševića and Sajmište.
Towards Trg Slavija: runs via ulice Milentija Popovića, Bulevar Mihajla Pupina, roundabout near TC "Ušće", Sajmište, roundabout near Sajmište barracks, Sajmište (opposite "So i biber"), Brankov most, then regular route.
Towards Novi Beograd: runs via Brankov most, internal bypass road leading under Brankov most near "Brankov Most" skate park, Sajmište, roundabout near Sajmište barracks, Staro Sajmište, Sajmište, roundabout near TC "Ušće", Bulevar Mihajla Pupina, Milentija Popovića, then regular route.
Line 60 unchanged
Line 60 operates on its regular route in both directions. Solo vehicles are used instead of minibuses.
Temporary stops
- "Staro Sajmište 1" (#4174, towards Brankov most) for line 9A – located approximately 65 meters before the roundabout near Sajmište barracks
- "Staro Sajmište 1" (towards Blok 72/TC "Euroazija" terminus) for lines 9A and 60 – in ulica Staro Sajmište, approximately 40 meters before the intersection with ulica Sajmište
Show the operator’s original text
Other changes
All changes- RoadworksLine 60: new circular route due to Old Sava Bridge renovationActive 14.11.2026. – 02.09.2027.Same lines60
- RoadworksJurija Gagarina Street: lines 9A and 89 rerouted until MarchActive 29.08.2026. – 31.03.2027.Same lines9A
- RoadworksOld Sava Bridge: lines 7, 9, 9A, 78 and 83 change routes until 2027Active 02.11.2024. – 02.09.2027.Same lines9A
- RoadworksSurčinska and Vojvođanska: bus stops moved on nine linesActive 14.11.2026. – 16.12.2026.
- Stop changeLines 76 and 77: KBC "Bežanijska kosa" stop relocatedActive 12.11.2026. – 30.11.2026.
- RoadworksSremčica: routes 511, 511N, 551, 560a and 5538 change until December 5Active 10.11.2026. – 05.12.2026.