busevi.rsBelgrade public transport
M2

Metro Line 2 · Belgrade Metro

Mirijevo – Bežanija

  • Stations24
  • Kilometres21.4
  • interchange6

This line is not in service. In preparation. The route links Zemun and Bežanija with Mirijevo via Savski trg and Slavija. Works are announced to begin in 2027–2028.

The dashed line joins stations in a straight line — the official source does not publish the actual tunnel geometry.

Stations in order

From Mirijevo to Bežanija

  1. Mirijevointerchange
  2. Ustaničkainterchange
  3. Zvezdara
  4. Pijaca Zvezdara
  5. Vojislava Ilićainterchange
  6. Gospodara Vučića
  7. Južni bulevar
  8. Karađorđev park
  9. Slavija
  10. Savski trginterchange
  11. Blok 18
  12. Blok 21interchange
  13. Merkator
  14. Opština Novi Beograd
  15. Džona Kenedija
  16. Gradski park
  17. Stadion Zemun
  18. Filipa Višnjića
  19. Ugrinovačka
  20. Zemun Novi grad
  21. ŽS Zemun
  22. KBC Bežanijska kosa
  23. Marka Čelebonovića
  24. Depo Bežanijainterchange

Frequently asked questions

Does Belgrade have a metro?

Not yet — no line is in service. Works on Line 1 are under way and the first line is announced for 2030.

How many metro lines are planned?

Three. Line 1 runs from Železnik to Mirijevo, Line 2 from Mirijevo to Bežanija, and Line 3 from Bežanija to Banjica. Interchanges are planned at Savski trg, Blok 21, Ustanička and Mirijevo.

When will the Belgrade metro open?

Line 1 is announced for 2030, in phases — phase one runs from Železnik to Pančevački most. Works on Line 2 are expected from 2027–2028; no dates have been set for Line 3.

Will the metro have drivers?

Under the contract with the train manufacturer, driverless trains with automatic operation are planned.

What runs until the metro opens?

Bus, tram and trolleybus lines, plus BG Voz — the city rail that already does what the metro will do on routes towards Batajnica, Rakovica and Železnik.

Facts checked on 2026-08-25. The project is ongoing and routes change. Sources: Belgrade Metro and Train — interactive map, RTS — contract for the first phase of Line 1